Michael Lamb was the Project Manager and Construction Manager for the City of Boulder Parks and Recreation Department. Michael and his construction lead, designed and the City Parks Construction Crew rebuilt the Labyrinth Park following the 2013 flood.
The project includes:
• Log walls
• Open lawn play
• Landscape planting
• ADA ramp into the play area
• Log climb stairs
• Sloped climbing wall
• Log ramp
• Creek beach and water play
Copyright © 2023 Wolf Lamb Design - All Rights Reserved.
Powered by GoDaddy Website Builder