Michael Lamb, Principal / Owner SBA, Seattle WA, designed and managed the
construction of improvements to the Cypress Island campgrounds for the
Washington State Department of Natural Resources. The island is accessible only
by personal boat or plane.
The improvements included the following:
Cypress Head:
1. Remove two vault toilets upland and replace with solar compost toilets.
2. Upgrade up to three campsites to ADA accessible sites on lower beach area.
3. Add one solar compost toilet near lower campsites.
4. Improve trail between site improvements (non-ADA trail).
5. Replace existing mooring field buoys with new embedded anchor buoys. 4 total
Eagle Harbor:
1. Remove and replace one vault toilet with one new solar compost toilet.
2. Construct trail above the high water mark to existing dirt road.
3. Install mooring field in harbor. Up to 7 or 8 embedded anchor buoys.
Pelican Beach:
1. Replace mooring field buoys with 4 – 5 embedded anchor buoys
Copyright © 2025 Wolf Lamb Design - All Rights Reserved.
Powered by GoDaddy Website Builder