Michael Lamb, City of Boulder Parks and Recreation Project and Construction Manager, took over the construction phase of the Boulder Reservoir Entry. During the construction phase, city staff requested a permanent building instead of a tarp canopy for the ANS (Aquatic Nuisance Species) building for boat inspections. Michael designed a "building" and then worked with Tuff Shed Company to build a custom shed that met staff needs and matched the new entry gate buildings. By value engineering the ANS building the City saved over 90% of the cost for an architectural building.
The project includes:
ANS building
Power and Internet WiFi to the Entry gate buildings
Concrete drain inspection
Loop Road
Vehicle and Boat Trail parking
Copyright © 2023 Wolf Lamb Design - All Rights Reserved.
Powered by GoDaddy Website Builder