Michael Lamb was the Project Manager and Construction Manager for the City of Boulder Parks and Recreation Department. Michael and his construction lead designed and constructed the ADA trail at Coot Lake. The trail and the associated wetland required preserving the habitat and addressing erosion issues. The City Park Construction Crew built the trail and shore line.
The Trail includes: An ADA StaLoc soil material surfacing for easy maintenance without mud or dust. Rock shore areas, Drainage improvements, Access area to lake for dogs, Signage, Picnic table area, Slope mitigation, Rail fencing, Fishing, and boulder areas.
Copyright © 2023 Wolf Lamb Design - All Rights Reserved.
Powered by GoDaddy Website Builder